| |
Construction Photos - Week of 02/29/08
Looking at the SE corner of the BWR pump room
Looking at the SE corner of the BWR pump room
Looking at truckload of electrical PVC duct, steel conduit and 2-1/2” flex conduit
Looking at floor and wall sleeves
Looking at the water stop, reinforcement and bulkhead on the BWR SE corner lower pump room wall
Looking at the rebar and bulkhead on the BWR SE corner lower pump room wall
Looking at BWR lower pump room SE corner wall construction
Looking at BWR lower pump room wall construction on the SE corner
Looking at the BWR pump room SE corner wall
Looking at the BWR pump room SE corner wall
Looking south at the BWR lower pump room SE corner
Looking SE at the site from on top of the hill north of Clearwell
Looking south at the site from on top of the hill north of the Clearwell structure
Looking SW at the site from on top of the hill north of the Clearwell structure
Looking west at the site from on top of the hill north of the Clearwell structure
Thumbnail panels:
|
|
|