Construction Photos - Week of 03/07/08
Looking at the interior wall form set in the west wall of the BWR pump room and rebar placed on the south wall
Looking at a truckload of misc PVC and steel piping
Looking at a truckload of misc PVC and steel piping
Looking at BWR pump room SW corner
Looking at BWR pump room south wall rebar and west wall interior forms
Looking at electrical conduit and duct delivered on 2/27/08
Looking at misc PVC and steel pipe delivered on 3/6/08
Looking at misc PVC and steel pipe delivered on 3/6/08
Looking at the wall forming and rebar placement on the BWR pump room south and west walls
Looking at the cover on the east wall of the south end of the BWR pump room
Looking at the form work staging area at the east end of the site
Looking at the form work staging area at the east end of the site
Looking at the form work staging area at the east end of the site
Looking at the Clearwell slab east end
Looking NW at the Clearwell slab