Construction Photos - Week of 05/02/08

  • Image
    NE corner of Clearwell structure (pour #2)
  • Image
    Looking at the east Clearwell wall in the NE corner of the structure
  • Image
    Excavating west of the BWR pump room for the Washwater Recovery Basin slab
  • Image
    Looking at the north Clearwell wall on the west end (pour #5)
  • Image
    Shoring and deck support for the BWR upper slab
  • Image
    Shoring and deck support for the BWR upper slab
  • Image
    Placing concrete in the Clearwell wall NE corner (pour #2)
  • Image
    Excavation west of the BWR Pump Room for the Washwater Recovery Basin slab
  • Image
    Excavation west of the BWR Pump Room for the Washwater Recovery Basin slab
  • Image
    24” BWS wall sleeve in the north Clearwell wall on the west end
  • Image
    Looking at the north Clearwell wall on the west end
  • Image
    Looking at Washwater Recovery Basin sump slab and sloped slab excavation
  • Image
    Looking south at Washwater Recovery sloped slab excavation west of the BWR Pump Room
  • Image
    Clearwell slab water stop at the SE corner of the building (pour #4)
  • Image
    Clearwell slab water stop at the SE corner of the building (pour #4)
  • Image
    Clearwell slab water stop at the SE corner of the building (pour #4)
  • Image
    Looking at north Clearwell wall pour on the west end of the structure (pour #5)
  • Image
    Looking at the concrete used for pour #5
  • Image
    Looking at concrete placement in the north Clearwell wall on the west end (pour #5)
Thumbnail panels:
Now Loading

 

 
Home
Water Treatment Plant Construction
:   Construction Photos     Log Files
Lagoon
:   Construction Photos     Log Files