Construction Photos - Week of 05/16/08
Looking at the north Clearwell wall (pour #7) from north of the structure
Looking at the north Clearwell wall (pour #7) from north of the structure
Looking at the 8” NPW and 4” PW pipe sleeves in the north Clearwell wall
Looking at back fill on north end of the BWR pump room slab footing
Looking at the back fill north of the Washwater Recovery Basin sump slab and west of the BWR pump room
Looking at the 8” NPW and 4” PW pipe wall sleeves in the north Clearwell wall (pour #7)
Looking at the crew on the north clearwell wall pour #7
Looking at the east wall of the Clearwell structure on the south end (pour #4)
Looking at the SE corner of the Clearwell wall (pour #4)
Looking at the SE corner of the Clearwell wall (pour #4)
Looking at the north Clearwell wall concrete pour (pour #7)
Looking at the west end of the Contact Basin slab from the south side
Looking at the east end of the Contact Basin from the south side
Looking at the base material for the Washwater Recovery Basin slab
Looking at the base material for the Washwater Recovery Basin slab
Looking at the back fill at the SW corner of the BWR pump room
Looking at the back fill at the NW corner of the BWR pump room
Looking at the BWR pump room upper slab stairwell opening in the NW corner of the slab
Looking at the temporary stair access to the lower BWR pump room
Looking at the south Clearwell wall rebar matt. (Pour #6)