Construction Photos - Week of 08/15/08

  • Image
    View of the Contact Basin from the SE corner
  • Image
    View of the BWR PreSed slab from the SW corner
  • Image
    View of the BWR pump room from the NE corner
  • Image
    View of the BWR PreSed slab from the NE corner
  • Image
    View of the site from east to west from on top of the hill north of the Clearwell (1 of 6)
  • Image
    View of the site from east to west from on top of the hill north of the Clearwell (2 of 6)
  • Image
    View of the site from east to west from on top of the hill north of the Clearwell (3 of 6)
  • Image
    View of the site from east to west from on top of the hill north of the Clearwell (4 of 6)
  • Image
    View of the site from east to west from on top of the hill north of the Clearwell (5 of 6)
  • Image
    View of the site from east to west from on top of the hill north of the Clearwell (6 of 6)
  • Image
    Looking north at the Contact Basin center east/west and center north/south baffle wall intersection
  • Image
    Looking at the blockout in the east wall of the Clearwell inlet chamber
  • Image
    Looking at a small rock pocket approx. ½ way up the south Clearwell inlet chamber wall
  • Image
    View of the BWR pump room from the NE corner
  • Image
    Looking at the rebar on the south slope in the BWR PreSed slab
  • Image
    Looking at the rebar on the south slope in the BWR PreSed slab
  • Image
    Looking at the rebar on the south slope in the BWR PreSed slab
  • Image
    Looking at the east end of the Contact Basin center east/west wall
  • Image
    Looking at the rebar on the east end of wall pour #10 in the Contact Basin
  • Image
    Looking at the rebar on the east end of wall pour #10 in the Contact Basin
  • Image
    View of the Contact Basin from the SE corner
  • Image
    Looking at the 3:1 hillside excavation north of the BWR PreSed Basin
  • Image
    Looking north at the backfill on the east side of the BWR pump room
  • Image
    Looking at the Contact Basin wall #10 concrete placement
  • Image
    Looking at the Contact Basin wall #10 concrete placement
  • Image
    Looking at the Contact Basin wall #10 concrete placement
  • Image
    Looking at the Contact Basin wall #10 concrete placement from the SE corner
  • Image
    View of the BWR PreSed slab from the NW corner
  • Image
    Looking at the reinforcement on the south end of the Contact Basin inlet chamber east wall.
  • Image
    Looking at the reinforcement on the south end of the Contact Basin inlet chamber east wall.
  • Image
    Looking at the fill material being dumped for the BWR pump room backfill
  • Image
    Looking south at the area between the BWR PreSed slab and the Clearwell
  • Image
    Looking south at the reinforcement in the east end of Contact Basin wall #12
  • Image
    Looking south at the reinforcement in the east end of Contact Basin wall #12
  • Image
    Looking at the grouting on the exterior north wall of the Clearwell
  • Image
    View of the BWR PreSed slab from the SW corner
  • Image
    Looking east at the south end reinforcement on the Contact Basin east inlet chamber wall
  • Image
    Looking at the water near the sump slab in the BWR PreSed slab
  • Image
    View of the BWR PreSed slab from the SE corner
  • Image
    View of the Contact Basin from the SE corner
  • Image
    Looking at the temporary fill between the Clearwell and BWR PreSed structures
  • Image
    View of the Contact Basin wall #12 from the south side
  • Image
    Looking at the BWR PreSed slab reinforcement on the south slope
  • Image
    Looking at the BWR PreSed slab reinforcement on the south slope
  • Image
    Looking east at the intersection of Contact Basin wall pour #12 and #22
  • Image
    Looking east at the intersection of Contact Basin wall pour #12 and #19
  • Image
    Looking at the intersection of Contact Basin wall pour #10 and #18
  • Image
    Looking east at the Clearwell upper slab from the SE corner
  • Image
    Looking at Contact Basin wall #12 pour from the SE corner
  • Image
    Looking at Contact Basin wall #12 pour from the SW corner
  • Image
    Looking north at the temporary backfill between the Clearwell and the BWR PreSed Basin
  • Image
    Looking at the BWR pump room backfill from the SE corner
  • Image
    Looking at the BWR PreSed slab from the NE corner
  • Image
    Looking south at the east ½ of the Clearwell upper slab
  • Image
    Looking at the east ½ of the Clearwell upper slab from the SE corner
  • Image
    Looking at the east ½ of the Clearwell upper slab from the SE corner
  • Image
    Looking at the piping for floor draining the east ½ of the Clearwell upper slab
  • Image
    Looking north at the bulkhead for the Clearwell upper slab east 1/2