| |
Construction Photos - Week of 08/22/08
View of the south end of the BWR Pump Room top slab from inside the Pump Room
Looking at the rebar mat for the Contact Basin #20
View of the north end of the BWR Pump Room top slab from inside the Pump Room
View of the east half of the clearwell upper slab from the SE corner
View of the east half of the clearwell upper slab from the SE corner
View of the BWR pre sed basin slab from the SE corner of the Clearwell
Looking at the reinforcement in Contact Basin wall #17
View of the north side of the Contact Basin wall #12
View of the south side of the Contact Basin wall #12
View of the backfill on the east side of the BWR Pump Room
Looking north at the compaction of the subgrade for the 6” BSL line
Looking at the 6” BSL and 12” BWR pipe penetrations at the north end of the BWR Pump Room east wall
Looking at the wall penetration and encasement rebar on the 12” BWR in the east wall of the BWR Pump Room
Looking at the 12” BWR piping as it exits the BWR Pump Room east wall
Looking at the 6” BSL and 12” BWR pipe penetrations in the east wall of the BWR Pump Room
View of the BWR pre sed slab pour #1 from on top of the BWR Pump Room
View of the BWR pre sed slab pour #1 from on top of the BWR Pump Room
View of the BWR pre sed slab pour #1 from on top of the BWR Pump Room
Looking south at the BWR pre sed slab pour #1
View of the BWR pre sed slab pour from on top of the BWR Pump Room
Thumbnail panels:
|
|
|