Construction Photos - Week of 9/14/07
Looking east at 100-ton crane
Facing NE at Clear Well structure
Facing NE at Wash Water slab reinforcement
Looking at 100-ton crane on site
Looking at 100-ton crane on site
Facing NE at Clear Well form work
Facing north at Wash Water Recovery slab reinforcement
Facing north at site grading and drainage ditch
Looking at 9-yard concrete trucks that arrived on site today (9/12/07)
Lunch provided by Apollo
Lunch provided by Apollo
Bags of course aggregate for baffle in sediment ponds from aggregate wash system
Facing west at Clear Well slab reinforcement (bottom mat)
Facing west at Clear Well slab reinforcement (bottom mat)
Looking at the water stop (wall joint) in the SE corner of the Wash Water slab
Facing north at Wash Water slab reinforcement
Looking at Clear Well slab reinforcement at the SE corner of the structure
Looking at Clear Well slab reinforcement at the NE corner of the structure
Looking at the Clear Well slab reinforcement at the NW corner of the structure
Looking at the Clear Well slab reinforcement at the SW corner of the structure
Facing south at east side of Clear Well slab
Facing south at Wash Water lower pump room drain from the sump
Facing north at Wash Water lower pump room drain from the sump