Construction Photos - Week of 10/10/08

  • Image
    View of the dirt work at the east end of the site
  • Image
    View of the dirt work at the east end of the site
  • Image
    Looking at brick veneer at the SE corner of the BWR building
  • Image
    View of the east wall of the BWR masonry building
  • Image
    View of the south wall of the BWR masonry building
  • Image
    48” pipe spool for the filter effluent pipe at the chlorine and ammonia injection area in the west inlet of the Clearwell
  • Image
    Looking west at the Contact Basin upper slab (1 of 3)
  • Image
    Looking west at the Contact Basin upper slab (2 of 3)
  • Image
    Looking west at the Contact Basin upper slab (3 of 3)
  • Image
    View of BWR Pre Sed Basin SW column pour
  • Image
    Looking at the concrete placement of the 36” wall thimble in the west wall of the Contact Basin
  • Image
    Interior view of the 36” wall thimble in the west wall of the Contact Basin
  • Image
    Looking at the brick veneer at the SE corner of the BWR masonry building
  • Image
    South to east view of the Contact Basin upper slab from the NW corner (1 of 3)
  • Image
    South to east view of the Contact Basin upper slab from the NW corner (2 of 3)
  • Image
    South to east view of the Contact Basin upper slab from the NW corner (3 of 3)
  • Image
    View of the NW corner of the upper Contact Basin slab
  • Image
    View of the BWR masonry building north wall
  • Image
    View of BWR masonry building NW corner
  • Image
    View of the BWR Pre Sed SE column pour
Thumbnail panels:
Now Loading

 

 
Home
Water Treatment Plant Construction
:   Construction Photos     Log Files
Lagoon
:   Construction Photos     Log Files